Oracle 1z1-244 Exam Overview:
| Certification Vendor: | Oracle |
|---|---|
| Exam Name: | Oracle E-Business Suite R12: Advanced Supply Chain Planning |
| Exam Number: | 1Z0-244 |
| Available Languages: | English |
| Exam Format: | Scenario-based Questions, Multiple Choice |
| Related Certifications: | Oracle Supply Chain Planning Certification Path Oracle E-Business Suite R12 Inventory Management Oracle E-Business Suite R12 Supply Chain Management |
| Passing Score: | Approximately 60-70% |
| Certificate Validity Period: | Subject to Oracle certification policy (often does not expire for older Oracle EBS certifications) |
| Exam Price: | USD 245 (may vary by region) |
| Real Exam Qty: | 50-70 (multiple choice, varies by version) |
| Exam Duration: | 90-120 |
| Recommended Training: | Advanced Supply Chain Planning (ASCP) Courses Oracle University EBS R12 Supply Chain Planning Training |
| Exam Registration: | Oracle Certification Registration Pearson VUE Oracle Exams |
| Sample Questions: | Oracle 1z1-244 Sample Questions |
| Exam Way: | Computer-based exam delivered via Oracle University and Pearson VUE test centers or online proctored exam |
| Pre Condition: | Recommended knowledge of Oracle E-Business Suite R12 Supply Chain modules and basic supply chain planning concepts |
| Official Syllabus URL: | https://education.oracle.com |
Oracle 1z1-244 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Topic 1: Plan Analysis and Execution | - Planner Workbench usage
|
| Topic 2: Demand Planning and Forecasting | - Demand management integration
|
| Topic 3: Advanced Supply Chain Planning Concepts | - Supply chain planning setup
|
| Topic 4: Supply Planning and Optimization | - Advanced Supply Chain Planning optimization
|
Oracle EBS R12: Advanced Supply Chain Planning Sample Questions:
Your client Is set up to run a Constrained plan ABC. This plan Is set up with the Enforce Demand Due Dates option.
The plan ABC Is run successfully and the outcome of the plan is ready.
Which three options can be expected as recommendations out of the plan ABC run?
- A. A purchase requisition Is scheduled within the lead-time set for the Item.
- B. A Job is scheduled to use two resource units when there is only one resource unit available.
- C. Planning time fence is respected.
- D. One machine resource Is overloaded.
- E. One of the demands is going to be fulfilled late.
Correct Answer: A,B,D 🗳️
Identify five Material Constraints.
- A. Substitute components
- B. Change of Shift timings
- C. Tolerance fences
- D. Order modifiers
- E. Resource efficiency and utilization
- F. Effectivity Dates of Operations in Routings
- G. Effectivity Dates of Components in Engineering changes
- H. Effectivity Dates of Components In Bills of Material
Correct Answer: A,B,C,D 🗳️
Identify the correct statement about setting lead time information In the Sublnventory Definition form.
- A. The lead times defined in the Subinventory Definition form is used only during a Constrained Optimized plan with penalty factors and decision rules.
- B. The ASCP planning engine uses the subinventory lead time information only for transfers across Organizations.
- C. The ASCP Planning engine does not use the lead times defined in the Sublnventory Definition form.
This Is only for the Min-Max Planning process. - D. The precedence for lead time Is Items (First priority), Supplier (Second priority), and Subinventory (Third priority).
- E. The ASCP planning engine uses Preprocessing and Postprocessing lead times only from the Sublnventory Definition form.
- F. The ASCP planning engine uses the sublnventory lead time Information only for an Intra-Organization transfer purpose.
Correct Answer: F 🗳️
ABC Corporation uses a third-party configuration tool for booking their configured sales orders and creating a configured Bill of Material (BOM). This is a simple configuration process.
However, during the Implementation of Oracle E-Business Suite, the client installed Inventory, BOM, Work In Process (WIP), Engineering, Order Management, Receivables, and General Ledger modules. The SuperUser wants Oracle to be used for creating a configured BOM when a Sales Order Is created.
What would be your recommendation in this situation?
- A. Create a BOM with type "Configuration" when a new sales order is booked.
- B. Execute the concurrent program "Populate Configuration Models," which creates the configured BOM.
Schedule it to run at a set frequency. - C. The client has to purchase "Oracle Configurator" and install it to achieve the above requirement.
- D. Use the configurator option available in Order Management, which creates the configured BOM.
Correct Answer: A 🗳️
For Make Items, the time required to make the Item If you have all of the Buy Items In Inventory and have to make all Subassemblies and the Item Itself Is called______.
- A. Cumulative Manufacturing Lead Time
- B. Preprocessing Lead Time
- C. Postprocessing Lead Time
- D. Variable Lead Time
- E. Fixed Lead Time
- F. Processing Lead Time
- G. Cumulative Total Lead Time
- H. Lead Time Lot Size
Correct Answer: G 🗳️
Viewing page 1 out of 18 pages.
Viewing questions 1-5 out of 90 questions.

We're so confident of our products that we provide no hassle product exchange.


By Jonathan


