NEW QUESTION 19
When creating a resource plan within a demand, how are the default dates on a resource plan determined?
- A. Using demand created date
- B. From portfolio date
- C. Resource plan(s) cannot be created from demand
- D. From demand start date and due date
Answer: D
NEW QUESTION 20
Demand managers can enhance a demand request by adding the following: (Choose three.)
- A. Problems
- B. Decisions
- C. Requirements
- D. Stakeholders
- E. Change Requests
Answer: B,C,D
NEW QUESTION 21
Depending on the execution type selected for a particular project, one of these dashboards will also be available:
- A. Project Summary - Waterfall Dashboard
- B. PMO Dashboard
- C. User Manager Dashboard
- D. Timecard Dashboard
Answer: A
NEW QUESTION 22
Which 'Member Preference' automatically finds the most available resource(s) from the group and allocates to a plan using the allocation action?
- A. Any member and specific member.
- B. All members.
- C. Any member.
- D. Specific member.
Answer: C
NEW QUESTION 23
The RIDAC workflow can be modified by using which feature?
- A. Flow Designer
- B. Service Catalog
- C. Project Form
- D. Idea Portal
Answer: C
NEW QUESTION 24
Which of the following states appear in the process flow indicator at the top of the Demand form by default?
(Choose three.)
- A. Updated
- B. Draft
- C. Screening
- D. Approved
- E. Deferred
Answer: B,C,D
NEW QUESTION 25
What is the difference between confirm and allocate actions?
- A. Confirm action creates hard allocation and allocate action creates soft allocation.
- B. Allocate action is always followed by confirm action.
- C. Confirm action creates soft allocation and allocate action creates hard allocation.
- D. They function the same way.
Answer: C
NEW QUESTION 26
Where are CAPEX and OPEX targets set for each fiscal year?
- A. Program Workbench
- B. Portfolio Target
- C. Cost Plans
- D. Demand Workbench
Answer: B
NEW QUESTION 27
How does a project manager request a change to a resource plan in the requested state?
- A. Use notes on resource plan.
- B. Email resource user.
- C. Request change on resource plan
- D. Email resource manager
Answer: C
NEW QUESTION 28
The hourly rate is derived from the resource rate on the resource plan, if this option is selected.
- A. Labor rate card
- B. Rate override
- C. Planned cost
- D. Rate model
Answer: D
NEW QUESTION 29
In what way would you restrict the assigned to field on a project task to only allow users with resource allocations to be assigned?
- A. On the project record under the preferences tab select the "Derive assignee list from resource plan" preference.
- B. The system automatically does this and can only be disabled by an admin.
- C. Create an Access Control List (ACL) rule.
- D. Create a reference qualifier on the 'assigned to' field.
Answer: A
NEW QUESTION 30
What system role is needed to manage programs?
- A. it_program_manager_admin
- B. it_program_manager
- C. it_portfolio_manager_admin
- D. it_project_manager
Answer: B
NEW QUESTION 31
A pps_admin role can configure the parameters that are displayed on a project card. The parameters displayed on a project card are derived from the records in what table?
- A. Project Time Card Exception [project_time_category].
- B. Theme [scrum_theme].
- C. PM Home Page Card [pm_home_page_card].
- D. CMDB Health Scorecard [cmdb_health_scorecard_group].
Answer: C
NEW QUESTION 32
What happens to the expense line after it is processed?
- A. Nothing significant results.
- B. The actual cost is recorded at the portfolio level.
- C. The actual amount incurred becomes part of the cost plan.
- D. The cost plan closes.
Answer: C
NEW QUESTION 33
Which roles can view reports on resource utilization and availability? (Choose two.)
- A. pps_resource
- B. resource_user
- C. resource_manager
- D. it_project_portfolio_user
Answer: B,C
NEW QUESTION 34
A project expense line is a cost associated with a specific source. Examples of specific sources could include:
(Choose three.)
- A. Demand.
- B. Project.
- C. Fixed Asset.
- D. Configuration Item (CI).
- E. User.
Answer: C,D,E
NEW QUESTION 35
Plugins may be added to the base platform in one of the following ways: (Choose three.)
- A. Activated by default in the base ServiceNow system.
- B. Activated by an admin (not by default).
- C. Requested from ServiceNow.
- D. Activated by an it_portfolio_manager.
- E. Activated by an it_pps_admin.
Answer: A,B,C
NEW QUESTION 36
Which of the following roles can access the project administration application?
- A. it_project_manager.
- B. it_pps_admin.
- C. it_project_user.
- D. timecard_admin.
Answer: B
NEW QUESTION 37
Where do you define 'Roles' requested via resource plans?
- A. No need to define it differently, they are same are system roles
- B. Resource roles under resource management.
- C. Roles under system security
- D. Under skill management modules
Answer: B
NEW QUESTION 38
Which roles can modify agile properties? (Choose two.)
- A. admin.
- B. scrum_master.
- C. it_pps_admin.
- D. product_owner.
Answer: A,C
NEW QUESTION 39
......