
Dependable C_P2W22_2504 Exam Dumps to Become SAP Certified
Get Ready with C_P2W22_2504 Exam Dumps (2026)
NEW QUESTION # 17
What are some options for creating a production order?
Note: There are 2 correct answers to this question.
- A. By converting a purchase requisition
- B. By setting a Kanban container to empty
- C. By partially converting a planned order
- D. By setting a Kanban container to full
Answer: B,C
NEW QUESTION # 18
What does forecasting in the demand planning cycle include?
Note: There are 3 correct answers to this question.
- A. Past quotation quantities
- B. Market intelligence
- C. Past production planning quantities
- D. Past sales order quantities
- E. One-off events
Answer: B,D,E
NEW QUESTION # 19
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question.
- A. Operation duration
- B. Planned delivery time
- C. In-house production time
- D. Total replenishment lead time
Answer: B,C
NEW QUESTION # 20
Which of the following are scheduling time elements for a production order?
Note: There are 3 correct answers to this question.
- A. Float before production
- B. Load time
- C. Setup time
- D. Transit time
- E. Queue time
Answer: A,C,E
NEW QUESTION # 21
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.
- A. Planning strategy
- B. Requirements type
- C. Order type
- D. Requirements profile
Answer: A,B
NEW QUESTION # 22
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.
- A. Capacity requirements chart
- B. Order (dispatched) chart
- C. Work center capacities chart
- D. Order (pool) chart
Answer: A,C
NEW QUESTION # 23
What is a prerequisite for the consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?
- A. MRP creates a dependent requirement.
- B. A sales order is created.
- C. A sales order is delivered.
- D. MRP creates a planned order.
Answer: B
NEW QUESTION # 24
Which of the following processes lead to an indicator in the planning file?
Note: There are 2 correct answers to this question.
- A. Changing a dependent requirement
- B. Changing an operation time
- C. Changing a delivery address
- D. Changing a storage bin
Answer: A,B
NEW QUESTION # 25
Which order type is used for repetitive manufacturing?
- A. Process order
- B. Production order
- C. Planned order
- D. Kanban order
Answer: C
NEW QUESTION # 26
When does the system trigger replenishment for a Kanban container?
- A. When you set the container to Full
- B. When you set the container to Empty
- C. When you set the container to In transit
- D. When you set the container to Waiting
Answer: B
NEW QUESTION # 27
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you choose in SAP S/4HANA to track and use this information in all areas of logistics?
- A. Process order management
- B. Quality management
- C. Engineering change management
- D. Batch management
Answer: D
NEW QUESTION # 28
Which alternative item strategies are available in bills of material (BOMs)?
Note: There are 2 correct answers to this question.
- A. Manual maintenance
- B. Ranking
- C. 100% check
- D. Simultaneous
Answer: A,C
NEW QUESTION # 29
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program.
Which planning strategy do you use?
- A. Planning without final assembly (50)
- B. Planning with final assembly (40)
- C. Assembly processing with production orders (82)
- D. Make-to-stock production (10)
Answer: D
NEW QUESTION # 30
You are trying to create a production order and no valid production version can be selected. What could be the reasons?
Note: There are 2 correct answers to this question.
- A. No bills of material (BOMs) are assigned to the production versions.
- B. The basic start date is NOT within the validity period of the production version.
- C. No production lines are assigned to the production versions.
- D. The order lot size is NOT within the validity range of a production version.
Answer: B,D
NEW QUESTION # 31
Which of the following is a scheduling method for a production order?
- A. Key date scheduling
- B. Lead time scheduling
- C. Determination of delivery date
- D. Determination of basic dates
Answer: B
NEW QUESTION # 32
Your production planners are supposed to execute planning only for specific resources. What do you use to achieve this in Advanced Planning (PP/DS)?
- A. A propagation range
- B. A planning group
- C. A planning area
- D. A work center hierarchy
Answer: B
NEW QUESTION # 33
Which options do you have to post goods receipt for a process order?
Note: There are 2 correct answers to this question.
- A. You post the entire manufactured quantity to one batch if the product quality changes during production.
- B. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production.
- C. You post the entire manufactured quantity to multiple batches if the product quality changes during production.
- D. You post the entire manufactured quantity to one batch if the product quality remains consistent during production.
Answer: C,D
NEW QUESTION # 34
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.
- A. Storage location MRP areas are required to manage sales-order-specific stock.
- B. Net requirements calculation is carried out for every sales order individually.
- C. Production and procurement costs are managed on the sales order item level.
- D. Planned orders are created in MRP with reference to sales orders.
- E. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
Answer: B,C,D
NEW QUESTION # 35
......
Download Exam C_P2W22_2504 Practice Test Questions with 100% Verified Answers: https://www.topexamcollection.com/C_P2W22_2504-vce-collection.html
Realistic C_P2W22_2504 Dumps are Available for Instant Access: https://drive.google.com/open?id=19xv4YPGmKC8mGkCxPzVlPFD3e3axf100

