IBM P2065-013 Exam Overview:
| Certification Vendor: | IBM |
|---|---|
| Exam Name: | IBM Intelligent Operations Center Technical Mastery Test v1 |
| Exam Number: | 000-N13 |
| Exam Format: | Multiple Choice |
| Passing Score: | 70% |
| Exam Price: | Approx. $200 USD |
| Available Languages: | English |
| Exam Duration: | 60 minutes |
| Certificate Validity Period: | No expiration (IBM Mastery credential) |
| Real Exam Qty: | 31 |
| Related Certifications: | IBM Intelligent Operations Center Solutions |
| Sample Questions: | IBM P2065-013 Sample Questions |
| Exam Way: | Online proctored or onsite testing (retired) |
| Pre Condition: | No formal prerequisites; recommended familiarity with IBM Intelligent Operations Center products |
IBM P2065-013 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Troubleshooting and Support | 20% | - Performance optimization - Common issues and resolution - Log analysis and diagnostics |
| Architecture and Components | 25% | - Integration framework - Core components and modules - System architecture overview |
| Configuration and Administration | 30% | - User and role management - Data integration and connectivity - KPI and policy configuration - Reporting and dashboard setup |
| Installation and Deployment | 25% | - System requirements - Installation procedures - Configuration and setup |
IBM Intelligent Operations Center Technical Mastery Test v1 Sample Questions:
You can define an action in a Standard Operating Procedure to do any of the following, EXCEPT:
- A. Execute a custom class, script, or executable program
- B. Manipulate the business processsteps in-flight
- C. Initiate an application action
- D. Change the status of a record
Which Hardware Deployment Kit should you use for basic Intelligent Operations Center Pilot program?
- A. IBM zBX
- B. IBM System x3500 M3
- C. IBM BaldeCenter H
- D. IBM BladeCenter S
A "node" in a Standard Operating Procedure is:
- A. added at specific business process junctures to denote the entry of a record into the business process
- B. the start or stop location at the ends of a workflow series
- C. an associated processing point for a particular action in a workflow
- D. a point in the workflow process to handle an external connection
What policies are currently built-in to the Intelligent Operations Center?
- A. Policies to determine flood potential around water leak detection of a given geographic area
- B. All of the above
- C. Policies that correlate event types that are within a given time or geographic distanceof each other
- D. Policies that will determine conflicting CBRNE events within a given time period

We're so confident of our products that we provide no hassle product exchange.


By Daisy


