NACE NACE-CIP2-001 Exam Overview:
| Certification Vendor: | AMPP (Association for Materials Protection and Performance, formerly NACE International) |
|---|---|
| Exam Name: | Coating Inspector Level 2 Theory Exam |
| Exam Number: | NACE-CIP2-001 |
| Certificate Validity Period: | 3 years |
| Passing Score: | 70% |
| Exam Price: | $400 - $450 USD |
| Real Exam Qty: | 100 |
| Related Certifications: | CIP Level 1 Pipeline Coatings Inspection Specialty CIP Level 3 |
| Exam Duration: | 120 minutes |
| Exam Format: | Computer-Based Testing (CBT), Multiple-choice questions, Separate practical performance assessment |
| Available Languages: | English, Turkish, Chinese, Spanish, Japanese, Korean |
| Recommended Training: | AMPP Exam Preparation Guide AMPP CIP Level 2 Official Training Course |
| Exam Registration: | AMPP Official Certification Portal Pearson VUE Testing Center |
| Sample Questions: | NACE NACE-CIP2-001 Sample Questions |
| Exam Way: | Theory exam: Computer-Based Testing (CBT) via Pearson VUE; Practical exam: In-person hands-on assessment conducted during training |
| Pre Condition: | Active CIP Level 1 certification; 2 years of verifiable coating-related work experience; completion of CIP Level 2 training course; approved certification application |
| Official Syllabus URL: | https://www.ampp.org/certification/certified-coatings-inspector-cip-level-2 |
NACE NACE-CIP2-001 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Coating Application & Equipment | 15% | - WFT/DFT measurement & verification - Environmental controls & conditions - Plural-component & electrostatic application |
| Topic 2: Advanced Standards & Specifications | 20% | - Interpretation of international standards - Project specification review & compliance - Contractual requirements & quality plans |
| Topic 3: Documentation, Safety & Compliance | 10% | - Ethics for corrosion professionals - Health, safety & environmental regulations - Inspection reporting & records |
| Topic 4: Failure Analysis & Repair | 15% | - Repair procedures & quality control - Coating failure mechanisms & causes - Maintenance & long-term performance |
| Topic 5: Inspection & Testing Techniques | 20% | - Non-destructive inspection methods - Adhesion & destructive testing - Holiday & pinhole detection - Defect identification & evaluation |
| Topic 6: Surface Preparation Methods | 20% | - Centrifugal blast cleaning - Surface profile & cleanliness assessment - Non-ferrous & concrete substrate preparation - High-pressure waterjetting |
NACE Coating Inspector Level 2 Sample Questions:
Question 1
You are the NACE Level 2 Inspector on a project where overcoating of galvanized steel is being performed. The specification references SSPC SP 16 as the surface preparation method. At the pre-job meeting operations personnel make it clear that abrasive blasting will not permitted. The Owner's representative asks you what other methods might be used.
Of the options shown below, what would be the preferred option in this situation?
A. SP 1 followed by caustic etching
B. SP 1 followed by SP 2
C. SP 1 followed by acid etching
D. SP 1 followed by SP 3
Question 2
The coating applicator has ignored a enface preparation hold point and applied coating over the surface without a sign off from you as the inspector.
Your FIRST preferred course of action is to:
A. Advise the Owner and write a Non-Conformance report
B. Stop the job
C. Require the Applicator to remove the coating
D. Ignore the situation
Question 3
When working with someone who is very concerned about Stability and maintaining adherence to the status-quo, the Inspector should try to:
A. Implement immediate to get them motivated
B. Give them as much advance notice as possible about upcoming changes
C. Make sure they are the center of attention in all site meetings
D. Challenge their value to the team and try to get them out of their comfort zone
Question 4
Antifouling coatings are regulated by international treaties.
A. True
B. False
Question 5
When measuring the Dry Film Thickness Of liquid coatings applied to galvanized ferrous substrates the most commonly used instrument is the:
A. Tooke Gauge
B. Ultra Sonic DFT Gauge
C. Eddy Current Gauge
D. Magnetic Gauge
Solutions:
| Question 1 Answer: B | Question 2 Answer: C | Question 3 Answer: B | Question 4 Answer: A | Question 5 Answer: A |