Oracle EBS R12: Advanced Supply Chain Planning Sample Questions:
1. ABC Corporation uses a third-party configuration tool for booking their configured sales orders and creating a configured Bill of Material (BOM). This is a simple configuration process.
However, during the Implementation of Oracle E-Business Suite, the client installed Inventory, BOM, Work In Process (WIP), Engineering, Order Management, Receivables, and General Ledger modules. The SuperUser wants Oracle to be used for creating a configured BOM when a Sales Order Is created.
What would be your recommendation in this situation?
A) Create a BOM with type "Configuration" when a new sales order is booked.
B) Execute the concurrent program "Populate Configuration Models," which creates the configured BOM.
Schedule it to run at a set frequency.
C) The client has to purchase "Oracle Configurator" and install it to achieve the above requirement.
D) Use the configurator option available in Order Management, which creates the configured BOM.
2. Select two correct statements about standard operations.
A) If you assign the operation code of standard operation in a routing, the standard operation information Is copied into the operation that you are currently defining.
B) Standard operations are used only in a flow manufacturing environment.
C) When defining resource setup Information, there Is no option of specifying the standard operations used during changeovers.
D) Standard operations are commonly used operations that you can define as a template for use in defining future routing operations.
E) You cannot modify the standard operation information after adding the information into your new operation.
3. Company ABC ran an ASCP plan with the Enforce Capacity Constraints Constrained option.
The planning Input Is: Sales Order Item: XYZ001
Sales Order Due date: 15 March Sales Order quantity: 1000
The supplies pegged to this sales order line are:
Job 1: Quantity 500 and due date 13 March Job
2: Quantity 200 and due date 15 March Job
3: Quantity 300 and due date 17 March
Which three statements are true in the above example about the Sales Order Due date?
A) Days Late is 2 (17 March - 15 March).
B) Quantity satisfied by Sales Order line schedule date is 700.
C) Demand is satisfied onl7 March.
D) Demand is satisfied onl5 March.
E) Days Late Is 2 (15 March - 13 March).
F) Days Late is 4 (17 March - 13 March).
4. Your client received some plan-related constraint exception messages. Identify two such messages.
A) Requirement with insufficient lead time
B) Requirement causes resource overload
C) Requirement is firmed late
D) Transportation volume constraint
E) Order causes supplier capacity overload
F) Order Is firmed early
G) Order lead time constraint
5. View the Exhibit.
The Exhibit displays the Horizontal Plan for a Resource In a constrained plan.
Which statement Is correct with reference to the Horizontal Plan displayed?
A) The first Bucket Displayed is PO which always represents the current System Date.
B) The Load Ratio is calculated by dividing the Required Capacity by the Net Hours Available.
C) The Work Order field displays the quantity remaining to produce on all Work Orders with status Released.
D) The Hours available field shows the Available Capacity by time bucket for the displayed Resource.
E) In the 02-Feb Bucket, the Net ATP Is a negative value; however, the "Cum hours avail..." field remains positive indicating this is an Enforce Capacity Constraints Plan.
Solutions:
| Question # 1 Answer: A | Question # 2 Answer: A,D | Question # 3 Answer: B,C,E | Question # 4 Answer: E,G | Question # 5 Answer: B |