OMG UM0-200 Exam Overview:
| Certification Vendor: | Object Management Group (OMG) |
|---|---|
| Exam Name: | OMG-Certified UML Professional Intermediate Exam |
| Exam Number: | UM0-200 |
| Exam Format: | Multiple Choice, Scenario-based Questions, UML Diagram Interpretation |
| Available Languages: | English |
| Exam Price: | USD $350 |
| Passing Score: | Not officially published |
| Related Certifications: | OMG Certified UML Professional (OCUP) Advanced OMG Certified UML Professional (OCUP) Fundamental OMG Certified UML Professional (OCUP) Intermediate |
| Real Exam Qty: | Approximately 60 |
| Certificate Validity Period: | Does not expire (subject to OMG certification program policies) |
| Exam Duration: | 90-120 (English-speaking countries); up to 120-150 for non-native English regions depending on delivery policy |
| Sample Questions: | OMG UM0-200 Sample Questions |
| Exam Way: | Delivered through authorized OMG testing providers; available at test centers and, where supported by the provider, via online proctored examination. |
| Pre Condition: | Passing the OMG-Certified UML Professional Fundamental Exam (UM0-100/OCUP Foundation or equivalent) is typically required before attempting the Intermediate level. |
| Official Syllabus URL: | https://www.omg.org/uml-certification/ |
OMG UM0-200 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Component and Deployment Diagrams | - Architecture modeling
|
| State Machine Diagram | - State-based behavior
|
| General UML Concepts | - Core language concepts
|
| Activity Diagram | - Behavior modeling
|
| Class Diagram | - Advanced class relationships
|
| Package and Use Case Modeling | - Model organization
|
| Composite Structure Diagram | - Internal structure modeling
|
| Sequence Diagram | - Interaction modeling
|
OMG Omg-Certified uml professional intermediate Sample Questions:
What determines whether a loop continues execution?
- A. partitions
- B. clauses
- C. guards
- D. test nodes
- E. behaviors
Correct Answer: D 🗳️
Which relationships would make the model in the exhibit ill-formed?
- A. SpecialOrder and Order are related to each other via a dependency.
- B. SpecialOrder is a subtype of Order.
- C. SpecialOrder and Order are related to each other via an association.
- D. Order is a subtype of SpecialOrder.
Correct Answer: D 🗳️
What is NOT a valid VariableAction?
- A. AddVariableValueAction
- B. ClearVariableAction
- C. RemoveVariableValueAction
- D. SetVariableAction
- E. ReadVariableAction
Correct Answer: D 🗳️
What interface restrictions does a port have?
- A. multiple provided interfaces and multiple required interfaces
- B. multiple required interfaces or multiple provided interfaces
- C. exactly one required interface and exactly one provided interface
- D. equal numbers of provided interfaces and required interfaces
- E. exactly one provided interface or exactly one required interface
Correct Answer: A 🗳️
In the exhibit, what applies if the interaction constraint is false when the loop is entered?
- A. The loop body is not included in a valid trace.
- B. The specification is illegal.
- C. All valid traces will include message r.
- D. Valid traces include both the case where the loop iterates once, and when it iterates zero times.
Correct Answer: C 🗳️

We're so confident of our products that we provide no hassle product exchange.


By Sigrid


