HP Building HP Server Solution Sample Questions:
1. Your customer has the HP 6125G Ethernet Blade Switch installed in interconnect bay 1 of a c3000 enclosure. What is the maximum number of additional interconnects that can be installed in the enclosure?
A) One
B) Five
C) seven
D) Three
2. When a blade is inserted into a bay that has a VCM profile assigned, which action will the VCM perform before the server is allowed to power on?
A) Download new firmware update
B) Check the embedded teaming configuration
C) Configure the NIC ports with profile provided MAC addresses
D) Determine the Server OS
3. Which configuration task can you perform using Virtual Connect Manager?
A) Assign custom speed to the uplink ports.
B) Establish IRF link between Virtual Connect modules.
C) Create an I/O connection profile for each server in the enclosure.
D) Back up Onboard Administrator configuration.
4. Which HP tool of utility can be used to evaluate the current firmware versions on a ProLiant server to determine which components need to be updated?
A) QuickSpecs
B) intelligent Provisioning
C) Smart Update Manager
D) Integrated Management Log
5. What should be installed on a Proliant Gen8 server to gather operating system information through the iLO?
A) Agentless Management Service
B) ProLiant Support Pack
C) HP Management Service
D) Systems Insight Manager
Solutions:
| Question # 1 Answer: D | Question # 2 Answer: C | Question # 3 Answer: D | Question # 4 Answer: C | Question # 5 Answer: A |

We're so confident of our products that we provide no hassle product exchange.


By Harry


