Huawei H12-425_V2.0-ENU Exam Overview:
| Certification Vendor: | Huawei |
|---|---|
| Exam Name: | HCIP-Data Center Facility Deployment V2.0 |
| Exam Number: | H12-425_V2.0-ENU |
| Available Languages: | English |
| Exam Duration: | 120 minutes |
| Passing Score: | 80% (typical passing threshold as 600/1000) |
| Exam Format: | Short response, Single answer, Multiple choice, Drag-and-drop, True/False |
| Certificate Validity Period: | 3 years |
| Real Exam Qty: | Approx. 468–523 (varies by practice material, official number not public) |
| Related Certifications: | HCIE-Data Center Facility Design HCIA-Data Center Facility HCIP-Data Center Facility Design |
| Exam Price: | 160 USD (approx.) |
| Sample Questions: | Huawei H12-425_V2.0-ENU Sample Questions |
| Exam Way: | Onsite / Pearson VUE test centre |
| Pre Condition: | Recommended: HCIA-Data Center Facility or equivalent experience |
| Official Syllabus URL: | https://e.huawei.com/en/certification |
Huawei H12-425_V2.0-ENU Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Cooling Solutions | 13% | - Air-cooled precision air conditioners - Data center cooling system overview - Chilled water precision systems - Modular indirect evaporative cooling |
| Introduction to Huawei Data Center Infrastructure | 2% | |
| Modular Data Center Solutions (FusionModule Series) | 8% | - Smart Mini and Small Data Center Solutions - FusionModule2000 and 5000 introductions - FusionDC1000 solution overview |
| Monitoring and Management | 20% | - DCIM product features - Huawei DCIM management tool introduction |
| Power Distribution and UPS Systems | 25% | - FusionModule installation and UPS deployments - VRLA battery applications - Integrated UPS introduction - UPS2000 and UPS5000 commissioning and operation |
Huawei HCIP-Data Center Facility Deployment V2.0 Sample Questions:
Question 1
Three UPS5000-E-400Ks from a 2+1 parallel system. Which of the following statements about the parallel system are true?
A. If the load is 420 kW, each of two UPSs carries 210 kW load, and the other one is standby and does not carry load.
B. If the load is 420 kW, each of the three UPSs carries 140kW load.
C. The parallel system capacity displayed on the LCD is 1200 kVA.
D. The networkingmode is set to one-to-multiple for one UPS, and set to one-to-one for the other two UPSs.
Question 2
The static load of the FusionModule2000 cabinet can support 2400KG.
A. True
B. False
Question 3
A UPS system is configured with a single 50mm "2 (209A) cable, and the maximum current capacity allowed by the system is?
A. 209A
B. 174A
C. 104A
D. 160A
Question 4
When multiple FusionModule products are used in the same project, when configuring NetEco, the associated application scenario should select?
A. Customize
B. FusionMoudle5000
C. Associate FusionMoudle series
D. FusionModule2000
Question 5
Which of the following measures does the NetEco management system take to ensure the security of the software platform and prevent the leakage of business sensitive data? (Multiple choice)
A. The management system passes the security scan of anti-virus software
B. The transmission channel between the management system and the collector adopts encrypted transmission mode
C. User password is encrypted
D. Security reinforcement and vulnerability prevention for operating systems, databases, and management systems
Solutions:
| Question 1 Answer: B | Question 2 Answer: A | Question 3 Answer: A | Question 4 Answer: A | Question 5 Answer: A,B,C,D |