EMC DES-6121 Exam Overview:
| Certification Vendor: | Dell EMC |
|---|---|
| Exam Name: | Specialist, Implementation Engineer | Converged Infrastructure Exam |
| Exam Number: | DES-6121 |
| Exam Duration: | 90 minutes |
| Related Certifications: | Dell EMC Proven Professional Implementation Engineer |
| Available Languages: | English |
| Exam Format: | Multiple Choice, Multiple Response |
| Passing Score: | 63% |
| Certificate Validity Period: | No expiration (versioned) |
| Real Exam Qty: | 60-68 |
| Exam Price: | 230 USD |
| Recommended Training: | Dell Technologies Learning |
| Exam Registration: | Pearson VUE Registration |
| Sample Questions: | EMC DES-6121 Sample Questions |
| Exam Way: | In-person at Pearson VUE test centers / Online proctored |
| Pre Condition: | Recommended 1+ year experience with VxBlock/Vblock systems; no mandatory prerequisite exam |
| Official Syllabus URL: | https://education.dell.com/content/dam/dell-emc/documents/en-us/DES-6121_IE_VxBlock_Systems_Core_Specialist_Exam.pdf |
EMC DES-6121 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Advanced Configuration & Provisioning | 27% | - Compute and hypervisor integration - Storage provisioning (VNX, Unity, VMAX, XtremIO) - Network and SAN configuration |
| Planning and Site Readiness | 18% | - VxBlock System architecture overview - Physical and logical planning guidelines - Site survey and infrastructure requirements |
| Post-Deployment & Troubleshooting | 15% | - System health monitoring - Deployment finalization and documentation - Common issues and resolution |
| Manufacturing Build Process | 20% | - Configuration documents and validation - Physical build procedures - Logical build and cabling standards |
| Standard Onsite Deployment | 20% | - Component verification and connectivity - Initial system validation - Unpacking, installation and power-up |
EMC Specialist, Implementation Engineer | Converged Infrastructure Sample Questions:
Before unpacking and moving the Dell EMC VxBlock System from the docking bay to the data center, you inspect the route the equipment is going to take. Why is the route from the docking bay to the data center important?
- A. Remove any obstacles that might interfere with the movement
- B. Confirm security authorization through the route
- C. Verify the shortest route is taken in order to minimize any damage to the system
- D. Ensure the temperature and humidity of the route is kept the same as the data center
Correct Answer: D 🗳️
Which management tool is used to validate that vMotion is functional on a Dell EMC VxBlock System?
- A. Array Management Server
- B. VMware vCenter
- C. VMware NSX Manager
- D. Dell EMC Vision
Correct Answer: C 🗳️
What is the number of supported ports in a UCS I/O Module on a Dell EMC VxBlock System?
- A. 12
- B. 8
- C. 2
- D. 6
Correct Answer: A 🗳️
In a Dell EMC VxBlock System environment, what is a valid security option for the PI cabinet?
- A. HID card reader only system
- B. Biometric screening system
- C. Full electrical security lock handle system
- D. Open LDAP authentication
Correct Answer: A 🗳️
A Dell EMC administrator has an existing VxBlock System 740 with an AMP-2HA base configuration The administrator is planning an upgrade to an AMP-2HA performance configuration How many RUs of free space are needed in the cabinet to ensure a successful upgrade?
- A. 1
- B. 2
- C. 3
- D. 4
Correct Answer: B 🗳️

We're so confident of our products that we provide no hassle product exchange.


By Donna


