SAP C-TSCM42-64 Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | Production - Planning & Manufacturing with SAP ERP 6.0 EHP4 |
| Exam Number: | C-TSCM42-64 |
| Certificate Validity Period: | Indefinite (until SAP ERP 6.0 EHP4 support ends; retired exam) |
| Available Languages: | English, French, Portuguese, German, Spanish, Japanese |
| Real Exam Qty: | 80 |
| Passing Score: | 60% |
| Exam Price: | USD 276–550 (varies by region/package) |
| Related Certifications: | SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP5 (C_TSCM42_65) |
| Exam Duration: | 180 minutes |
| Exam Format: | Scenario-based, Multiple choice, Computer-based proctored |
| Recommended Training: | TSCM40 Planning & Manufacturing I SCM240 Production Planning in SAP ERP TSCM42 Planning & Manufacturing II |
| Exam Registration: | Pearson VUE SAP Exam Registration SAP Training & Certification Shop |
| Sample Questions: | SAP C-TSCM42-64 Sample Questions |
| Exam Way: | Online proctored or at authorized Pearson VUE test centers |
| Pre Condition: | No formal prerequisites; basic knowledge of SAP ERP Production Planning recommended |
| Official Syllabus URL: | https://training.sap.com/ |
SAP C-TSCM42-64 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Demand Management & MRP | 20% | - MRP Procedures & Planning Strategies - MRP Evaluation & Exception Messages - Demand Management & Planned Independent Requirements - Net Requirements Calculation & Lot Sizing |
| Topic 2: Repetitive Manufacturing & Kanban | 10% | - REM Master Data & Run Schedule Quantities - REM Confirmation & Backflushing - Kanban Process & Control Cycles |
| Topic 3: Capacity Planning | 15% | - Capacity Evaluation & Load Analysis - Work Center Capacity Configuration - Capacity Leveling |
| Topic 4: Production Orders | 25% | - Material Staging & Goods Movements - Order Creation & Release - Order Status Management - Order Confirmation & Settlement - Availability Check & Scheduling |
| Topic 5: Master Data | 20% | - Material Master - Production Versions - Bill of Materials (BOM) - Routings and Task Lists - Work Centers - Engineering Change Management |
| Topic 6: Product Cost Planning | 10% | - Cost Rollup & Analysis - Cost Estimate with Quantity Structure - Integration with PP |
SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP4 Sample Questions:
Question 1
A user you advise wishes to transfer variable process instructions for automated processing directly to certain work centers and machines in the production department (for example, feed speed, pressing pressure, dry temperature). The user also wishes to receive variable as-is messages (such as actual quantities, actual times) from these work centers and machines and to process these messages for feedback concerning production orders. Which of the following options would you recommend to implement these requirements?
A. SAP Business Intelligence (BI)
B. Execution Steps (XSteps) and process messages
C. SAP Application Link Enabling (ALE)
D. Plant data collection (PP-PDC) interface
Question 2
In the SAP ECC system, a material is produced with the help of production orders. Though originally used for rate-based planning only, the planning table is to be used to plan this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material.
Which one of the following reasons for this message applies?
A. There are no planned orders or production orders present.
B. There is no valid production version for this material.
C. The series production indicator has not been set.
D. There are no requirements present.
Question 3
A finished material is to be planned in a controlled manner in the SAP ECC system in the context of requirements planning. The planned orders are scheduled using what is known as basic date scheduling (not lead-time scheduling). Which of the following statements is true for the resulting dependent requirements?
A. If individual material components are explicitly assigned to operations during BOM and routing maintenance, the requirement dates of the dependent requirements for these components are scheduled at each of the operation start dates.
B. When a customer order is created for the finished product, the dependent requirements are automatically triggered for the components in the bill of material without a planning run.
C. In multi-level backward scheduling, dependent requirements are triggered at the start date for the higher-level assembly planned order.
D. In multi-level backward scheduling, dependent requirements are triggered at the start date for the higher-level assembly.
Question 4
Which of the following master data is mandatory for production order processing, when material reservations and capacity requirements for operations should be generated automatically?
(Choose two.)
A. Material master records (product and material component)
B. Routing
C. Inspection characteristics
D. Production versions
E. Document structure
Question 5
In what order are the individual steps of material requirements planning performed in SAP ECC?
A. 1. Availability check2. Application of the lot-sizing procedure3. Determination of the procurement type 4. Scheduling
B. 1. Calculation of safety stock2. Application of the lot-sizing procedure 3. Scheduling4. Determination of the procurement type
C. 1. Net requirements calculation2. Application of the lot-sizing procedure3. Determination of the procurementtype4. Scheduling
D. 1. Net requirements calculation2. Application of the lot-sizing procedure 3. Scheduling4. Determination of the procurement type
Solutions:
| Question 1 Answer: B | Question 2 Answer: B | Question 3 Answer: D | Question 4 Answer: A,B | Question 5 Answer: C |