SAP C-P2W22-2504 Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing |
| Exam Number: | C-P2W22-2504 |
| Passing Score: | 65–68% |
| Available Languages: | English |
| Exam Duration: | 180 minutes |
| Real Exam Qty: | 80–82 |
| Exam Format: | Multiple-choice (single answer), Multiple-response questions |
| Related Certifications: | C_TS422_2504 |
| Recommended Training: | SAP S/4HANA Training Overview SAP Learning Hub |
| Exam Registration: | SAP Training & Certification |
| Sample Questions: | SAP C-P2W22-2504 Sample Questions |
| Exam Way: | Online proctored via SAP Certification Hub |
| Pre Condition: | None officially required |
SAP C-P2W22-2504 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Process Orders | <=10% | - Process manufacturing execution and control |
| Topic 2: Master Data | 11–20% | - Bill of materials (BOM), routing, production versions |
| Topic 3: Introduction to SAP S/4HANA Supply Chain Planning | <=10% | - SAP S/4HANA fundamentals and supply chain planning overview |
| Topic 4: Demand Management in SAP S/4HANA | <=10% | - Production strategies (make-to-order, make-to-stock, assembly planning) |
| Topic 5: Lean Manufacturing | <=10% | - Repetitive manufacturing, Kanban, line loading |
| Topic 6: Capacity Planning | <=10% | - Capacity evaluation and planning tables |
| Topic 7: Production Orders | 11–20% | - Order management, confirmations, and availability checks |
| Topic 8: Advanced Planning (PP/DS) | 11–20% | - Detailed scheduling and planning board usage - Advanced planning tools and heuristics |
| Topic 9: Introduction to SAP S/4HANA Production Planning | <=10% | - Production planning concepts and MRP vs consumption-based planning |
| Topic 10: Material Requirements Planning (MRP) | <=10% | - MRP run, lot sizing, planning strategies |
SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing Sample Questions:
You use the Finite Scheduling - with Reverse planning strategy and want to allow scheduling in the past.
How can you parameterize this in the strategy profile?
- A. Specify a negative PP/DS horizon
- B. Specify a negative opening period
- C. Specify a negative planning horizon
- D. Specify a negative offset time
Correct Answer: D 🗳️
You want to create a production order.
What methods can you use?
Note: There are 2 correct answers to this question.
- A. Convert a purchase requisition
- B. Create by order release
- C. Create in Kanban process
- D. Create without material
Correct Answer: C,D 🗳️
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.
- A. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
- B. Storage location MRP areas are required to manage sales-order-specific stock.
- C. Net requirements calculation is carried out for every sales order individually.
- D. Production and procurement costs are managed on the sales order item level.
- E. Planned orders are created in MRP with reference to sales orders.
Correct Answer: C,D,E 🗳️
You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles.
Which of the following SAP Signavio solutions can be used for the remodeling?
- A. SAP Signavio Process Intelligence
- B. SAP Signavio Process Insights
- C. SAP Signavio Process Manager
- D. SAP Signavio Process Governance
Correct Answer: C 🗳️
You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?
- A. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator
- B. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator
- C. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator
- D. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator
Correct Answer: D 🗳️

We're so confident of our products that we provide no hassle product exchange.


By Quinn


