Oracle Manufacturing Cloud 2026 Implementation Professional Sample Questions:
1. Which three entities must you set up in Oracle Manufacturing Cloud to create a work definition for an item that will be manufactured in-house?
A) Manufacturing lead time
B) Operations
C) Production line
D) Resources
E) Operation items
2. Two work definitions are created in the application: one for Engine Finished Good and the other for Pallet Finished Good. The Engine Finished Good item should have Pallet Finished Good as one of its components.
How can you establish the relationship between the Pallet and Engine work definitions?
A) The two work definitions can be tied through Project or Selban numbers.
B) Assign a higher priority to the work definition created for Engine and a lower one to the work definition for Pallet.
C) Work definition versions can be used to tie the work orders.
D) Create a subinventory to serve as the completion subinventory for yielding Pallet, and then use the same subinventory to serve as the supply subinventory of Pallet in the work definition created for Engine.
3. Your customer runs production 24 x 7 x 365 and wants to track Overall Equipment Effectiveness (OEE) online.
Which key setup can they use to achieve this?
A) Enable IoT Fleet Monitoring and enable synchronization to IoT Production Monitoring in Plant Parameters.
B) Enable IoT Production Monitoring and turn on "Enable synchronization to IoT Production
C) Enable IoT Asset Monitoring and turn on "Enable synchronization to IoT Asset Monitoring" in Resources.
D) Enable IoT Production Monitoring and turn on "Enable synchronization to IoT Production Monitoring" In Inventory Organization.
E) Enable IoT Asset Monitoring and turn on "Enable synchronization to IoT Asset Monitoring" In Plant Parameters.
4. Which three types of item quantities are displayed on the Work Order History tab?
A) Completed
B) Remaining
C) Total
D) In Process
E) Scrapped
5. A Plant Manager bought several machines for their ABC manufacturing plant. The plant is set up with a separate cost element set, ABC, in Manufacturing Cloud.
How must the Plant Manager configure these machines so that they are costed to the work order for which operations are performed on them?
A) Set up the machines with a cost element type of "Resource" by selecting Cost Element Set Common.
B) Set up the machines with a cost element type of "Resource" by selecting Cost Element Set AB
C) Set up the machines with a cost element type of "Overhead" by selecting Cost Element Set Common.
D) Set up the machines with a cost element type of "Overhead" by selecting Cost Element Set ABC.
Solutions:
| Question # 1 Answer: B,D,E | Question # 2 Answer: D | Question # 3 Answer: D | Question # 4 Answer: A,D,E | Question # 5 Answer: B |